CNC Machine Tending
Lathe, mill, multi-tasking machine loading/unloading. Dual-gripper swap (raw/finished). Door interlock, chip management, coolant proof. Cycle sync with CNC.
Dade Heavy Industry designs and builds automated loading and unloading systems for machine tending, press loading/unloading, CNC machine tending, press brake loading, stamping press automation, and forging press handling. 6-axis robots (6–500 kg payload), gantry loaders, 7th-axis linear tracks. Payloads 6–500 kg. Cycle time optimization, dual-gripper swap, vision-guided part location. Safety: fencing, light curtains, area scanners. 200+ machine tending cells delivered.
Payloads 6–500 kg · 6-axis robots + gantry loaders · 7th-axis tracks · 200+ machine tending cells
Lathe, mill, multi-tasking machine loading/unloading. Dual-gripper swap (raw/finished). Door interlock, chip management, coolant proof. Cycle sync with CNC.
Stamping, forging, hydraulic press loading. High-speed 6-axis + 7th axis. Dual-gripper rapid swap. Die protection, part presence. 30–60 SPM.
Sheet metal press brake loading/unloading. Blank centering, angle measurement feedback. Gantry or 6-axis + 7th axis. Batch & mixed SKU.
Hot forging press loading/unloading. High-temp grippers (up to 600°C). Infrared pyrometer integration. Water-cooled grippers. 5–15 sec cycle.
Plastic injection molding machine unloading. Sprue pick, part place on conveyor. Sprue picker + part gripper. Cleanroom option. 5–15 sec cycle.
Laser cutting load/unload, bending machine feed, end-forming load/unload. Vacuum/mechanical grippers. Bundle de-stacking. 6-axis + rotary.
Dade supplies 6-axis articulated robots, gantry loaders, and 7th-axis linear tracks matched to machine type, payload, and cycle time requirements. All cells include safety fencing, light curtains, area scanners, and PLC integration with machine controller.
| Configuration | Robot / Mechanism | Payload | Reach / Stroke | Typical Cycle | Best For |
|---|---|---|---|---|---|
| CNC lathe/mill tending | 6-axis robot (6–20 kg) | 6–20 kg | 1,400–2,000 mm | 15–45 sec | CNC lathe, mill, multi-tasking |
| Press brake loading | 6-axis + 7th axis track | 20–50 kg | 3–6 m track | 10–20 sec/bend | Press brake, panel bender |
| Stamping press loading | 6-axis + 7th axis track | 50–200 kg | 4–6 m track | 30–60 SPM | Stamping, progressive die |
| Forging press loading | 6-axis + 7th axis track | 100–500 kg | 4–6 m track | 5–15 sec | Hot forging, warm forging |
| Gantry loader | Gantry (X-Y-Z) | 50–500 kg | Up to 10 m span | 15–30 sec | Large parts, multiple machines |
| Injection molding unload | 6-axis (6–20 kg) | 6–20 kg | 1,400–2,000 mm | 5–15 sec | Injection molding, sprue pick |
Dade designs custom grippers for every part geometry and material. Quick-change tooling (Schunk, ATI) enables <60 sec changeover for mixed production.
| Gripper Type | Best For | Payload | Key Features |
|---|---|---|---|
| 2-finger parallel (pneumatic) | Rectangular/cylindrical parts | 5–50 kg | Compact, fast, force adjustable |
| 3-finger centric (pneumatic) | Cylindrical, round parts | 5–50 kg | Self-centering, high repeatability |
| Vacuum cup array | Flat/sheet metal, panels | 10–100 kg | No marking, large area |
| Magnetic (electro-permanent) | Ferrous parts, blanks | 50–500 kg | No power to hold, fail-safe |
| Needle / pin gripper | Pre-drilled holes, castings | 5–100 kg | Positive location, no slip |
| Custom form-fit (3D printed) | Complex geometries | 5–30 kg | Conformal, no marking |
| Dual-gripper (raw/finished swap) | Machine tending | 2× 5–20 kg | Simultaneous load/unload, 50% cycle reduction |
Dade's cell PLC (Siemens S7-1500 / Allen-Bradley ControlLogix / Mitsubishi MELSEC) communicates with machine controller via:
Standard handshake: Robot requests "door open" → Machine grants → Robot loads/unloads → Robot requests "door close" → Machine starts cycle.
| Component | Function | |
|---|---|---|
| Perimeter fencing | Physical barrier, 1.8–2.4 m height | |
| Safety light curtains (Type 4) | Entry/exit guarding, muting for part flow | |
| Area scanner (Type 3) | Collaborative zones, approach detection | |
| Safety-rated monitored stop | Robot stops when human enters zone | |
| Emergency stop (dual-channel) | Immediate stop, pull-cord on fence | |
| Door interlock (mechanical + RFID) | Prevents opening during cycle | |
| Two-hand control (for manual mode) | Operator safety during teach |
Typical payback: 8–18 months. Based on: eliminating 1–2 operators per shift (3 shifts), 30–50% cycle time reduction vs manual, 95%+ uptime vs 70–80% manual, consistent quality reducing scrap. Dade provides ROI calculator with your labor rates, shifts, and part volumes.
Yes. With 7th-axis linear track (1–6 m stroke) or gantry, one robot can tend 2–4 machines. Typical: 2 CNC lathes back-to-back, or 1 press + 1 CNC. Cycle time sharing requires careful scheduling; Dade simulates with your part programs. Dual-gripper (raw/finished swap) cuts non-productive time by 50%.
Vision-guided part location (2D/3D camera) detects part position/orientation and adjusts pick point. Recipe-based gripper changeover (<60 sec with quick-change). Recipe management via HMI or MES. Dade simulates mixed-SKU scheduling to guarantee cycle time.
ISO 10218-1/2 (robot safety), ISO 13849-1 PL d (safety-related control), ISO 13855 (safety distance), ISO 13857 (safety distances), ISO 14120 (guarding), NFPA 79 (electrical), OSHA 1910.212. CE marked. Optional: SEMI S2 (semiconductor), UL 1740 (US robots). Risk assessment included.
Yes. Dade's cell PLC supports Fanuc (FOCAS), Siemens (SINUMERIK OPC UA), Heidenhain (DNC), Mitsubishi (MELSEC), Mazak (MAZATROL), Okuma (OSP), Brother, DMG MORI. Protocols: Ethernet/IP, Profinet, Modbus TCP, OPC UA, CC-Link, FOCAS library. Hardwired I/O always provided as backup.
Single CNC tending cell (robot + gripper + safety + PLC): 8–12 weeks. Dual-machine with 7th-axis track: 10–14 weeks. Press line with 3+ machines, conveyors, part buffering: 16–24 weeks. Custom gripper development: add 2–4 weeks.
Send machine model/controller, part drawings/weights, cycle time target, annual volume, floor space, and integration requirements. Technical quotations within 5–10 business days for complete RFQ packages.
Send Inquiry Now