Technical guidance is the stage where a welding or cutting requirement becomes a workable specification. Dade's application engineers review the part drawing, the material, the joint design and the production volume, then translate them into a robot, power source and fixture combination that can actually be built. Most projects that go wrong later were specified too loosely at this point.
The review normally covers five questions: which welding or cutting process suits the joint, which robot payload and reach covers the envelope, which power source matches the material, what fixturing holds the part repeatably, and whether seam tracking is necessary. Each answer constrains the others, which is why they are evaluated together rather than in sequence.
The process choice sets everything downstream. Dade works across MIG/MAG, TIG, laser, plasma and resistance welding, and the selection depends more on the joint than on preference.
| MIG/MAG | Structural steel, thick section, high deposition. Standard choice for construction machinery, shipbuilding panels and general fabrication. |
|---|---|
| TIG | Stainless steel, aluminium, titanium where appearance and penetration control matter. Slower, but produces a clean, inspectable root. |
| Laser welding | Thin sheet, heat-sensitive alloys, dissimilar metals and battery components. Low heat input and narrow heat-affected zone. |
| Plasma welding | Stainless and nickel alloy pipe and tube, single-pass keyhole up to around 12 mm. |
| Resistance welding | Sheet metal assemblies, spot and projection joints, automotive body and appliance panels. |
Payload is calculated from the torch, wire feeder, cable pack and any sensor package, then a margin is added. Reach must cover the farthest joint plus clearance. On the power source side, the requirement is a digital interface that lets the robot controller adjust parameters in real time; a source that can only be set manually defeats most of the benefit of automation.
A welding robot is only as repeatable as the fixture that locates the part. Dade reviews datum strategy, clamp access around the torch path, and whether a positioner is needed to present the joint in the flat position. For parts over two metres, a seventh-axis track is usually part of the discussion.
The review is delivered as a written recommendation rather than a verbal opinion, so that it can be circulated internally and used as the basis for an RFQ. Where more than one configuration is viable, both are presented with the trade-off stated: typically cost against cycle time, or flexibility against changeover effort. Customers frequently ask for the cheapest option, and it is more useful to show what that option gives up.
Where the answer depends on data that is not yet available, such as the real cycle time of the current manual process or the actual tolerance band on incoming parts, Dade identifies the measurement that needs to be taken rather than assuming a value. Assumptions that are never stated are the most common reason a specification has to be reopened after the order.
The equipment families that result from this review are described under robotic welding cells, robot laser welding and robot cutting; representative specifications of the machines involved sit under products. Buyers who want the discussion carried further can arrange consultation with a Dade application engineer.
Part drawings in PDF or STEP, material specification and thickness, joint design, production volume per shift, the quality standard that applies, and site constraints such as floor area and available power.
A complete package is normally reviewed within five to ten business days. Incomplete drawings with undefined joints take longer because the gaps have to be resolved first.
Yes. Where volume is too low to amortise fixturing, or where part variation exceeds what seam tracking can absorb, a manual or semi-automatic process is the better recommendation and Dade will say so.
The initial process review is provided free of charge. Detailed engineering, fixture design and cycle-time simulation form part of the project once scope is agreed.