NEWS

NEWS

How to Purchase Industrial Robots and Welders

Release time:2025-05-15     Visits:1001

Preparing the Request for Quotation

A quotation is only as good as the information behind it. Dade returns a technical quotation within five to ten business days when the RFQ package is complete; an incomplete package typically adds weeks because the missing items have to be resolved through follow-up questions.

What to Send

RFQ package contents
Part drawingsPDF for reference plus STEP or IGES where available, with joints and weld symbols marked.
MaterialGrade, thickness or wall section, and any coating such as galvanised or primer.
Production volumeParts per shift, shifts per day, days per week, and whether the volume is stable or seasonal.
Cycle time targetThe takt time the cell must meet, or the current manual cycle time if no target is fixed.
Quality standardThe applicable code such as ISO 15614, ASME Section IX or AWS D1.1, and the inspection method.
Site constraintsFloor area, ceiling height, available power, compressed air, water and the safety perimeter.
Integration scopeTurnkey, supply-only, or cell-only where the customer integrates in house.

How Selection Works

With a complete package, the selection follows a defined sequence: payload and reach from the workpiece and payload stack, process from the material and joint, positioner from the part geometry, fixturing from the part family, and seam tracking from the tolerance band. Deviating from this order usually produces a specification that has to be reopened later.

Common RFQ Mistakes

Most delayed quotations are not delayed by the supplier. They are delayed by package gaps that could have been closed before the enquiry was sent.

Closing these six gaps before sending usually takes an hour and saves two weeks.

Quotation and Contract

The technical quotation states the configuration, scope of supply, battery limits, cycle time estimate and commercial terms. Once the technical scope is fixed, a contract-grade commercial proposal follows within one to two weeks. Payment terms are typically a deposit on order, a payment on factory acceptance, and the balance on shipment, with variation for turnkey projects.

Lead Times

Standard robot arms run eight to twelve weeks from order. Welding workstations with custom fixturing run ten to sixteen weeks. Fully custom lines with non-standard tooling and seam tracking run sixteen to twenty-four weeks. Lead times in the current supply environment are stable but should be confirmed per project.

Quotation inputs map onto the equipment families listed under products - robotic welding, robot cutting and robot palletizing among them. What happens after the enquiry arrives is described under solution proposal.

Frequently Asked Questions

How long does a quotation take?

Five to ten business days for a complete RFQ package, followed by one to two weeks for the commercial proposal once the technical scope is agreed.

Can we buy only the robot without a full cell?

Yes. Kawasaki, Fanuc and Estun arms can be supplied standalone with controller, teach pendant and commissioning support, with positioner, fixturing and safety added on request.

What are the payment terms?

Typically a deposit on order, a payment against factory acceptance testing, and the balance before shipment. Terms are adjusted for turnkey and export projects.

Do you provide budgetary pricing before a full RFQ?

A budgetary range can be given from the part and volume information alone, which is usually enough to support an internal investment decision before committing to full specification work.


Next:None
◇◇ Related content ◇◇
◇◇ Related products ◇◇
HOME APPLICATION APPLICATION tel NAVIGATION