A solution proposal starts by testing the requirement against what automation can realistically deliver. Dade engineers review the part family, the joint types, the tolerance band on incoming parts and the target output, then identify which of those constraints is likely to dominate the design. Often the binding constraint is not the weld itself but part presentation or takt time.
| Cell layout | Robot position, positioner placement, part flow in and out, safety perimeter and operator access. |
|---|---|
| Robot selection | Model, payload, reach, mounting and whether a seventh axis is required. |
| Process equipment | Power source, torch, wire feeder, shielding gas and fume extraction. |
| Fixturing concept | Datum strategy, clamp locations, changeover method for mixed part families. |
| Control architecture | PLC, HMI, safety logic and the interface to the customer's MES or ERP. |
| Cycle time | Simulated per-part cycle including load, weld, unload and any positioner indexing. |
Cycle time is estimated from the weld length, travel speed, positioner indexing and load/unload handling rather than from a rough rule of thumb. The estimate matters because it determines how many cells the project needs, which is usually the largest single driver of project cost.
The proposal includes a budgetary breakdown by subsystem so that the customer can see where the cost sits. Typical share for a MIG welding cell puts the robot and controller at 30 to 40 percent, the power source at 10 to 15 percent, the positioner at 10 to 20 percent, fixturing at 10 to 20 percent, safety at 3 to 5 percent and integration at 10 to 15 percent.
| Detailed engineering | Mechanical design, electrical schematics, safety assessment and bill of materials. |
|---|---|
| Manufacturing and assembly | Fabrication, wiring, integration and factory acceptance testing. |
| Shipment | Packing, export documentation and transit to site. |
| Installation and commissioning | Mechanical and electrical installation, parameter development, training and acceptance. |
| Handover | Documentation, spare parts, program backup and sign-off against the agreed criteria. |
The proposal depends on inputs from the customer side: confirmed part drawings for the whole family rather than a single representative part, the real tolerance band on incoming parts, the production plan including shift pattern, and confirmation of who performs installation and who supplies utilities. Where those inputs are provisional, the proposal states the assumption so that it can be revisited rather than silently invalidated later.
Proposal work continues into pre-purchase analysis, and the configurations proposed are drawn from robotic welding, robot laser welding and robot spraying. Comparable delivered solutions are listed under customer cases.
Cell layout, robot and equipment selection, fixturing concept, control architecture, cycle time estimate, scope of supply, budgetary costing and a project schedule.
From weld length, travel speed, positioner indexing time and load/unload handling, simulated per part rather than estimated from a general rule of thumb.
Yes. Lines are frequently proposed in phases so that capacity comes online as demand grows, with the layout and control architecture designed for the later phases from the start.
Usually the number of cells required, which is driven by cycle time, followed by fixturing when part families are diverse.