Before committing capital, the first question is whether automation actually fits the process. Dade assesses the part family for consistency, the volume for amortisation, and the joint for whether the chosen process can hold the required tolerance. A process that fights the part will cost more in rework than it saves in labour.
Payback is calculated from the labour released, the cycle time reduction, the scrap reduction and the maintenance cost added, against the capital cost of the cell.
| Labour released | Operators per shift before and after, multiplied by shifts, wage rate and annual working hours. |
|---|---|
| Output gain | Cycle time reduction converted into additional parts per shift where demand supports it. |
| Scrap reduction | Defect rate before and after, multiplied by material and rework cost per part. |
| Operating cost added | Power, shielding gas, consumables, maintenance and spare parts. |
| Capital cost | Cell price plus installation, fixturing and any site works. |
Across Dade's installed base, cycle time typically falls by 30 to 70 percent against manual welding on the same part, labour per cell falls from two to four operators down to roughly half an operator to one, and weld defect rates drop from a typical three to eight percent to under half a percent. Uptime moves from 70 to 80 percent on manual lines to above 95 percent on well-maintained robotic cells.
These are averages, not guarantees. The specific number for a given part depends on the joint design, the fit-up quality and how much of the manual cycle was handling rather than welding.
Full automation is one point on a spectrum, and the payback calculation should be run against more than one option before committing.
| Assisted semi-automatic | Positioner and power source assist the operator without a robot. Lowest capital, keeps human judgement on part variation. |
|---|---|
| Collaborative robot | No full safety fencing, quick to redeploy. Lower payload and slower, suited to low volume and high mix. |
| Dedicated robotic cell | Highest throughput and consistency. Requires volume and a stable part family to justify the fixturing. |
| Multi-robot line | For high volume with several operations. Highest capital but the lowest unit cost at scale. |
The right answer is the lowest-capital option that meets the required cycle time and quality standard on the actual part family, not the most automated option available.
The configurations that come out of this analysis are described under robotic welding cells, robot cutting and robot polishing, with unit specifications under products. Cycle time assumptions can be tested against solution proposal. Once the case is proven, the purchasing route is set out under how to purchase.
Payback commonly falls between eight and eighteen months where one to two operators per shift are released and the cell runs on a multi-shift pattern.
Typically 30 to 70 percent against manual welding on the same part, depending on how much of the manual cycle was handling rather than welding.
Then a dedicated cell is the wrong answer. Options include a shared cell serving several part families, a collaborative robot, or a semi-automatic positioner that assists the operator without full automation.
Yes. Scrap, rework and inspection cost are part of the calculation, and on stainless or aluminium work they can outweigh the labour saving.