Once the contract is signed, or even at the point of confirmed purchase intent, Dade provides a coordinated support package so that the customer is not left to work out the details alone. The scope covers everything between the equipment specification and a production line running at the agreed cycle time.
Machine selection is made against the customer's actual application characteristics and capacity requirement rather than against a catalogue. That means the process, robot and fixturing are chosen to suit the part, the volume and the quality standard, not the other way round.
| Cycle time analysis | Per-part cycle estimated from weld length, travel speed and handling time, with the assumptions stated. |
|---|---|
| Equipment selection | Robot, power source, positioner and safety equipment specified against the joint and the volume. |
| Fixture design | Datum strategy, clamp locations and changeover method for the part family. |
| Factory layout planning | Cell position within the existing floor plan, including material flow in and out. |
| Free sample processing | Trial parts welded or cut on comparable equipment so the result can be inspected before the order is placed. |
Operators do not need prior robot experience. Dade engineers train them against the processing requirement, starting from the fact that the cell has to produce a compliant part at the required rate. Training covers daily operation, program recall, simple parameter adjustment and fault recovery, and continues until the team can run the cell unaided.
Project coordination covers production scheduling, progress reporting, factory acceptance arrangements, shipping and on-site installation sequencing. The point is that the customer deals with one point of contact rather than chasing several suppliers, particularly on turnkey projects where the cell, the fixtures and the safety system all have to arrive in the right order.
Progress reporting runs on a fixed cadence with the same format each time, so that the customer can compare one report against the next rather than interpreting a different summary every week. Reports cover design progress, procurement status against the bill of materials, the assembly and testing schedule, and any open issues with an owner and a date.
Issues are raised when they are identified rather than at the next milestone. A fixture interference found during design costs a drawing revision; the same interference found during commissioning costs a schedule slip, and on a turnkey project that slip is the customer's production plan.
Handover is not the end of the relationship. Documentation, program backups and the recommended spares list are transferred at sign-off, and the after-sales service described on the support pages takes over. Customers frequently return to the same team when they extend a line or add a part family, because the project history and the cell configuration are already known.
Coordination starts from technical guidance, runs through equipment delivery and installation and debugging, and hands over to after-sales service. Machine options are listed under products.
Customised machine selection, cycle time analysis, equipment selection, fixture design, factory layout planning, free sample processing, zero-basics operator training and project coordination through to installation.
Yes. Trial parts are processed on comparable equipment so the customer can inspect the weld or cut before committing to the order.
No. Training is designed for zero-basics operators and continues until the team can run the cell without support.
One project coordinator handles scheduling, progress reporting, acceptance and shipping, so the customer does not have to coordinate several suppliers.